The quality of Window and Door Profile determines the quality of the project. If leakage will lead to poor drainage, the following Window and Door Profile will share the following measures for this problem.
The window rubber strip should be 10mm larger than the upper frame of the frame. The open window should be covered with water. Water flows out of the window to prevent water from entering the frame. When the glass is installed, a strip of glass glue on the bottom frame should be fully tightened, and the glass should be pressed directly. If the pressure is tight, the rainwater will not leak into the frame. It has been proved that the effect is obvious. The rubber strip must be tested, and the temperature difference between hot and cold must be measured, and it can be used only with a certificate.
Through the introduction of the above-mentioned plastic steel profile, in the production and installation of Window and Door Profile, only by strictly implementing the national standard and paying attention to overcome the quality problems that easily occur in the construction, its various superior properties can be fully utilized.